Cement & Aggregates
Order MOT Type 1 for delivery in March
MOT Type 1 is a crushed stone sub-base, graded from 31.5 mm (often sold as 40 mm) down to dust, that compacts into a firm, free-draining layer under driveways, patios, paths and floor slabs.
For jobs in March we quote MOT Type 1 as a delivered price to your postcode, with the vehicle and offload method agreed up front.

Your March delivery
- Nearby (straight line)
- Wisbech (8 mi), Ely (13 mi), Peterborough (14 mi)
- Postcode districts
- PE15, PE14, PE13
- How it arrives
- Bulk bags or tipped loads
- Daylight
- About 7h 39m on the shortest day
- Delivering to
- March, Cambridgeshire
- Delivery
- Standard mainland delivery
MOT Type 1 Sub-base we supply in March
- ScalpingsCheaper granular fill for less demanding areas.
- MOT Type 1 sub-baseGraded crushed stone to Specification for Highway Works clause 803.
- HardcoreBroken masonry fill for bulking up ground.
- Bulk bags and loose loadsBulk bags for most jobs; loose loads where access and volume suit.
Before your March delivery arrives
Bulk bags are usually crane-offloaded where access allows; very large quantities can be priced as loose tipped loads where access allows. March is inside our standard mainland delivery area.
- Give us the full postcode for the drop point; deliveries around PE15 are priced to the exact address.
- On busy streets in March, a parking suspension or a quiet time slot can make offloading safer, so tell us about local restrictions you know of.
- For a phased build we can split the order so materials arrive as each stage starts, which keeps the site clear.
Before you order MOT Type 1
Virgin or recycled?
Recycled Type 1 can be a good option where it meets the specification; ask what your project or local authority requires.
Compaction
Lay and compact in layers with a plate compactor. Allow extra material because it compacts down.
How much will you need?
A 10 × 4 m area at 150 mm compacted is 6 m³. At about 2.1 tonnes per cubic metre plus 10% that is 13.9 tonnes, or around 17 bulk bags. Try the sub-base calculator
Common questions from March
Can you tip it loose?
For larger quantities we can price a loose tipped load if the lorry can reach and there is space to tip.
How much MOT Type 1 do I need?
Multiply the area by the compacted depth to get cubic metres, then allow about 2.1 to 2.2 tonnes per cubic metre. At 100 mm deep, a tonne covers roughly 4.5 square metres.
Is there a minimum order for delivery to March?
There is no fixed minimum. For very small orders we will tell you honestly if the delivery cost outweighs the materials, so you can decide.
How soon can MOT Type 1 be delivered in March?
We confirm the delivery date when we price your order, before you commit. It depends on the product, the quantity and whether it is a stock line or made to order.
MOT Type 1 Sub-base near March
- MOT Type 1 Sub-base in Wisbech
- MOT Type 1 Sub-base in Ely
- MOT Type 1 Sub-base in Peterborough
- MOT Type 1 Sub-base in King's Lynn
- MOT Type 1 Sub-base in Spalding
- MOT Type 1 Sub-base in Huntingdon
Other materials for March sites
Send your list, get a delivered price
Tell us what you need and where it is going. We check the quantities and come back with a delivered price before you commit.