A lintel is a beam that carries the masonry over a door or window opening; most UK houses use galvanised steel cavity lintels or prestressed concrete lintels.

SK Trade is a builders' merchant delivering lintels into Bury, priced to your postcode and confirmed in writing.

Galvanised steel cavity lintels and concrete lintels stacked on timber bearers

Delivery facts for Bury

Postcode districts
BL9, BL8, OL10, BL0
How it arrives
On the lorry bed, hand or crane offload
Nearby (straight line)
Radcliffe (3 mi), Heywood (3 mi), Whitefield (3 mi)
Daylight
About 7h 27m on the shortest day
Delivering to
Bury, Greater Manchester
Delivery
Standard mainland delivery

Choosing from our lintels range

  • Prestressed concrete lintelsPlain concrete lintels for inner leaves and internal openings.
  • Steel cavity wall lintelsInsulated galvanised lintels that support both leaves of a cavity wall.
  • Cavity trays and stop endsTo shed water out of the cavity over openings.
  • Single-leaf and box lintelsFor solid walls, timber frame and internal walls.

Working out quantities for your Bury job

For a 1,800 mm clear opening, add at least 150 mm of bearing at each end: the lintel needs to be at least 2,100 mm long. Then pick the type for the wall build-up and check the load in the manufacturer's table, or ask your engineer if the opening carries a floor or roof.

Before your Bury delivery arrives

Lintels are long, so tell us about tight access. Shorter lintels can travel with a mixed load; long steel lintels are handled by hand or crane. Bury is inside our standard mainland delivery area.

  • If the drop point is block paving or soft ground, say so; heavy pallets and bulk bags can mark or sink.
  • For a phased build we can split the order so materials arrive as each stage starts, which keeps the site clear.
  • Weight limits on bridges or private roads near the site matter for larger lorries, so mention any you know of.

Getting the right lintels

Which lintel for my opening?

Measure the clear opening, add the end bearing each side, and note the wall type (cavity width, inner and outer leaf) and what sits above. Manufacturers publish load tables; for anything carrying a floor, roof or point load get an engineer or building control to confirm.

Steel or concrete?

Steel cavity lintels support both leaves and include insulation to limit cold bridging. Concrete lintels are simple and robust for single leaves and internal walls.

In England, building work is checked against the Approved Documents, for example Part A for structure and Part L for energy efficiency, through your council's building control team or a registered building control approver.

Ordering lintels for Bury: FAQs

How long should a lintel be?

The clear opening plus the end bearing at each side, typically at least 150 mm per end. Check the manufacturer's table for your lintel.

Do I need building control approval for a new lintel?

Making or widening an opening in a loadbearing wall is structural work, so in most cases yes. Building control or an engineer will confirm the lintel.

Can I add other materials to my Bury delivery?

Yes. Put everything on one list, from lintels to fixings and PPE, and we will price it as one delivery where the products can travel together.

Can you deliver lintels to a site with restricted access in Bury?

Usually, yes. Tell us about the access when you ask for a price and we will plan the vehicle and offload, or say if a smaller vehicle is needed.

Send your list, get a delivered price

Tell us what you need and where it is going. We check the quantities and come back with a delivered price before you commit.

CallGet a price