Concrete mix ratios for site-mixed concrete

For general site-mixed concrete, 1 part cement to 5 parts all-in ballast is the common mix, using roughly 15 bags of cement and just over 2 tonnes of ballast per cubic metre; structural concrete should follow the mix your engineer or building control specifies.

Written by the SK Trade team. Last reviewed 1 November 2026.

Common site mixes

Mix (cement : all-in ballast)Typical use
1:4Stronger general work
1:5General purpose: footings for garden walls, bases, posts
1:6Blinding and non-structural bases

Quantities per cubic metre

Dry materials take up more space than the concrete they make, so allow about 1.5 times the finished volume in dry materials. On that basis a cubic metre of 1:5 concrete needs about 370 kg of cement (roughly 15 bags of 25 kg) and about 2.2 tonnes of all-in ballast. Add a little extra for waste and uneven ground.

Designated and structural concrete

Foundations, floor slabs and anything structural are often specified as a designated mix such as GEN1 or RC30/37, or a strength class. Site mixing by hand cannot guarantee those, so for structural work and bigger pours ready-mixed concrete is usually the better route.

When to stop mixing by hand

Hand or mixer batching is fine for small pours. Once you need more than about a cubic metre, the time, labour and consistency usually favour ready-mixed concrete. For a fence post or two, bagged post mix is simplest.

Related products

Open the calculator

Related questions

What is all-in ballast?

A mix of sharp sand and gravel up to 20 mm, ready to combine with cement for concrete.

How many bags of cement for 1,000 bricks?

At a 1:4 mortar mix, about 8 to 9 bags of 25 kg cement and roughly 1 tonne of building sand, allowing for waste.